Final Report to Consultation “Cost-Benefit-Analysis” according to Art 38 Balanc-ing Network Code

The Austrian transmission system operators, Gas Connect Austria GmbH and Trans Austria Gasleitung GmbH established a consultation from October 9th, 2017, until November 3rd, 2017, according to article 38 Balancing Network Code (“Cost‑Benefit‑Analysis“). Based on the feedback of the balance group responsibles the following joint final report was done by the transmission system operators: